Oil Facilities Projects

Some of our successfully completed projects include the following:

  • Well head Upgrade Services with Remote Pressure, Temperature & Flow Data Monitoring Capability at Abura OML 65, Nigeria Petroleum Development Company (NPDC) / Gas Stream Asset Management Limited.
  • Engineering, Procurement, Installation & Commissioning of a 6000BOPD Condensate Stabilization Equipment at Oredo OML 111, Nigeria Petroleum Development Company (NPDC) / Schneider & Schroeder Nigeria Limited.
  • Engineering, Procurement, Construction and Installation of Oily Water Treatment Facility for NPDC at Oziengbe Flow Station, OML 111, Nigeria Petroleum Development Company (NPDC) / Zigma Limited.
  • Procurement of Mechanical & Instrumentation Materials for Izombe Flow Station, Imo State, Addax Petroleum Development Nigeria Limited.
  • Engineering, Procurement, Installation & Commissioning of Mobile Prover Loop for OML 111 Operation, Nigeria Petroleum Development Company (NPDC).
  • Flushing, Intelligent Pigging and Nitrogen Preservation of 10” x 22km Gas Export Pipeline spanning from Oredo Flow Station to POOC Ovade Ogharafe for Nigeria Petroleum Development Company (NPDC).
  • Engineering, Procurement, Construction & Installation of Gas Flow Meters, Flare Purge and Pilot Systems Modification at Oredo EPF & Oziengbe-South Flow Station, Nigeria Petroleum Development Company (NPDC).
  • Engineering, Procurement, Construction, Installation & Commissioning of Gas Flow Meters, Flare Purge, Auto Pilot and Ignition systems Modification at the Existing Oredo Flow Station, Nigeria Petroleum Development Company (NPDC).
  • Engineering, Procurement and Installation of 15nos 5,000psi Adjustable Chokes on Oredo Inlet Manifold, Nigeria Petroleum Development Company.

Hit enter to search or ESC to close